Automatic Voltage Regulator Installation Preparation Stage
Before preparing for the installation of automatic voltage regulator 20kva, ensure that the rated input and output voltages of automatic voltage regulator 500 kva match the voltage rating of the load equipment. When selecting the installation location, consider space ventilation, equipment heat dissipation requirements, and ease of future maintenance. The installation area should be far from strong interference sources and avoid direct sunlight or humid environments.
Gather the necessary tools and materials for installation, including copper cables of suitable cross-section, terminal connectors, insulating sleeves, grounding devices, and a multi-function meter. Before wiring, verify that the cable length and wire cross-section meet the automatic voltage regulator manufacturers rated capacity load requirements. The grounding wire must return directly to the building's grounding grid and use an independent grounding point to minimize interference.

Русский
Français
Português
Español
اللغة العربية






